NEWS
Position:
Homepage
/
/
/
How to improve the production management of the hot air pressure glue workshop?

How to improve the production management of the hot air pressure glue workshop?

How to improve the production management of the hot air pressure glue workshop?

(Summary description)Jiangmen Weixing reminds everyone how to improve the production management of the hot-air laminating machine workshop?

Information
Jiangmen Weixing reminds everyone how to improve the production management of the hot-air laminating machine workshop?
 
1. Adjust all the functions and data of the laminating machine three times a day, and test the water with the same cloth piece of the same bulk product at the pressure test level. After passing the test, the work can be started normally.
 
2. Before starting work and when shutting down after get off work, remember to follow the switch procedures.
 
3. The operator of the laminating machine must operate according to the data set for each laminating machine, and is not allowed to adjust the laminating data, especially the speed data without authorization.
 
4. Each workshop arranges a responsible worker for non-stop spot checks and water testing procedures. Test and randomize the pressing effect of each part of each machine and each semi-finished product or the finished product before closing. If there is a water leakage problem, the production of the machine with the problem should be stopped first, and the adjustment master should be notified immediately until it is qualified. And the semi-finished or finished product before the problem is 100% inspected, water tested, and pressure supplemented.
 
5. Each assembly line needs to arrange a responsible inspector to perform 100% inspection on all semi-finished products.
 
6. For certain cross position, T word position or certain positions, if the test often has water leakage problems and cannot be adjusted well, a 100% pressure compensation procedure is required.
 
7. The operators of the pressure glue machine, water test machine, and compensating machine should be fixed candidates and cannot be replaced casually. Due to frequent replacements, it will affect the quality of the product

Scan the QR code to read on your phone

Related information

2020
03-23
迪欧安普

How to improve the production management of the hot air pressure glue workshop?

Jiangmen Weixing reminds everyone how to improve the production management of the hot-air laminating machine workshop?
查看详情
2020
03-23
迪欧安普

Know what is heat sealing tape (waterproof tape)?

The heat-sealing tape is heated by special equipment (hot air seam sealing machine or laminating machine), and stitched on the needle holes of the knitted bones of waterproof and air-proof series products such as raincoats, tents, and air balloons to achieve sealing (water leakage, A kind of tape with anti-leakage effect.
查看详情
2020
03-23
迪欧安普

Jiangmen Weixing launches advanced ventilation pipe production equipment

Jiangmen Weixing launched a series of set generation equipment for the production of ventilation pipes
查看详情

Jiangmen Weixing Machinery Co., Ltd

Service Hotline: 

Address:

Jiaobei second industrial zone, Jianghai District, Jiangmen City, Guangdong Province, China

Copyright Jiangmen Weixing Machinery Co., Ltd   粤ICP备20039632号   Powered by 300.cn